Story
This HVAC project included the installation of heating water systems, along with low and mid-temperature chilled water systems. It involved installing comprehensive ductwork for supply, return, and outside air, all serving various air handling units (AHUs), fan coils, VAVs, and blower coils. For more localized temperature control, mini-split systems were also integrated. The scope of work extended to commercial kitchens, featuring the installation of hoods complete with makeup air units (MAUs), rooftop units (RTUs), and exhaust fans.
Facts
Submitter: Allied Mechanical Services
Architect: Chambers USA, TowerPinkster
Location: Kalamazoo, MI
Date contract completed: March 2026
Final contract value: $20,648,000
Project manager’s name: Mark Huizinga
Superintendent’s name(s): Rob Eifler
What percentage of the work scope was self-performed by your company? 100%