This project involved building a new Holland Hospital extension with exam, procedure, rehab, and X-ray rooms. Pleune Service Company, as the mechanical contractor, installed a snowmelt system, a boiler system, an AHU with VAV boxes, and a chiller. A major challenge was reconfiguring the tight boiler room layout to optimize piping and clearances.
Facts
Submitter: Pleune Service Company
Architect: Matthei & Colin Associates
Size: 16,000 SF
Location: Saugatuck, MI
Date contract completed: July 2024
Final contract value: $1,359,000
Project manager’s name: Chad Martindale
Superintendent’s name(s): JC Piela
What percentage of the work scope was self-performed by your company? 75%
Quality Air was proud to partner with Gentex Corporation on their newest production facility. The building features production areas, office spaces, training rooms, break rooms, and cafeteria. Three 1,200-ton chillers and four six-million BTU boilers serve the production areas and feed 11 air handling units that condition the facility.
Facts
Submitter: Quality Air
Architect: InterActive Studio
Size: 250,136 SF
Location: Zeeland, MI
Date contract completed: January 2024
Final contract value: $18,783,000
Project manager’s name: Jonathan Wooten
Superintendent’s name(s): Justin Miller & Jeff Ross
What percentage of the work scope was self-performed by your company? 100%
Corewell Ambulatory featured 125 aluminum doors, 5,600 SF of half-inch tempered glass, and a five-story handrail system. Completed in 8,000 man hours, the project highlighted Vos Glass’s precision and coordination in delivering high-end interior glazing systems with exacting standards for safety, aesthetics, and quality.
Facts
Submitter: Vos Glass
Location: Grand Rapids, MI
Date contract completed: December 2024
Final contract value: $4,000,000
Project manager’s name: Adam Mainprize
Superintendent’s name(s): Paul Haynes
What percentage of the work scope was self-performed by your company? 95%
Studio Park Tower is a 16-story apartment tower atop a six-story podium, featuring an 80,000 SF window wall system. Vos Glass delivered this complex and tallest project to date on a demanding schedule through precise planning, custom safety solutions, and in-house fabrication and labor.
Facts
Submitter: Vos Glass
Architect: Integrated Architecture
Size: 224,000 SF
Location: Grand Rapids, MI
Date contract completed: December 2024
Final contract value: $8,000,000
Project manager’s name: Paul Marckwardt
Superintendent’s name(s): Paul Haynes
What percentage of the work scope was self-performed by your company? 97%
The Center for Transformation and Innovation is a new office campus for Corewell Health in downtown Grand Rapids. The campus includes an eight-story office tower with two attached parking ramps and a two-story sky bridge connecting the existing Brass Works building to the new Office Tower.
Facts
Submitter: Sobie Company
Architect: NBBJ
Size: 155,105 SF
Location: Grand Rapids, MI
Date contract completed: June 2024
Final contract value: $6,270,000
Project manager’s name: David Langworthy
Superintendent’s name(s): Dave Snoeyink & Kyle Langworthy
What percentage of the work scope was self-performed by your company? 75%
The Muskegon Museum of Art expansion includes new galleries, exhibition space, an underground print gallery, two educational studios, a larger museum store, and a full-service workshop. Careful attention was paid to all details to create a space that compliments the art and people it will sustain.
Facts
Submitter: Halyard
Architect: Annum Architects
Size: 20,000 SF
Location: Muskegon, MI
Date contract completed: January 2025
Final contract value: $950,000
Project manager’s name: Jalen Brooks
Superintendent’s name(s): Nate Hayes
What percentage of the work scope was self-performed by your company? 80%
Ritsema Associates completed a unique project with eye-catching acoustical materials, including ceiling, wood wall, and fabric panels. Despite a tight schedule, the team ensured precision and safety, achieving a successful outcome.
Facts
Submitter: Ritsema Associates
Architect: Cornerstone Architects
Size: 50,000 SF
Location: Traverse City, MI
Date contract completed: September 2024
Final contract value: $791,000
Project manager’s name: Chad Malocha & Sarah Connell
Superintendent’s name(s): Greg Gillum
What percentage of the work scope was self-performed by your company? 75%
Old National Bank renovated their third-floor offices to create a more open, modern workspace. Phoenix Interiors LPDA division handled finishes, including angled metal stud framing, drywall, ceilings, and flooring. Materials were boom-lifted to the patio landing to ease access. Demolition revealed the historic connection points of three merged buildings.
Facts
Submitter: Phoenix Interiors, LLC
Architect: Ghafari Associates
Location: Grand Rapids, MI
Date contract completed: May 2024
Final contract value: $255,000
Project manager’s name: Doug Terpstra
Superintendent’s name(s): Daniel Aldana
What percentage of the work scope was self-performed by your company? 50%
The Amway Grand Atrium Refresh project revitalizes this space with a modern design infused with timeless craftsmanship. Featuring handcrafted walls and grand staircase, the refreshed atrium creates a striking focal point and welcoming atmosphere. It enhances guest experience while serving as a photogenic feature for the hotel’s establishments & patrons.
Facts
Submitter: The Bouma Corporation
Architect: Progressive Companies
Size: 11,000 SF
Location: Grand Rapids, MI
Date contract completed: June 2025
Final contract value: $477,000
Project manager’s name: Dan Sproull
Superintendent’s name(s): Steve Bos
What percentage of the work scope was self-performed by your company? 100%