eicawardsdev
on
June 13, 2025
Corewell Health — Orthopedic Surgery on the East Beltline campus combines sports and fitness, surgical, and clinical facilities. This 116,000 SF building required extensive site work for stormwater management. Key features include five operating rooms, three procedure rooms, and an indoor/outdoor athletic field, connected via a two-story walkway.
Submitter: Whiting-Turner Contracting Company
Architect: HKS
Size: 116,000 SF
Location: Grand Rapids, MI
Date contract completed: October 2024
Final contract value: $65,000,000
Project manager’s name: Nate Ranke, Anthony Mileto, Keegan Pacic, & Zach Hilt
Superintendent’s name(s): Mike Johnson, Hayden Schmidt, & Brandy Lopez
What percentage of the work scope was self-performed by your company? 0%
eicawardsdev
on
June 13, 2025
The 25,000 SF building exterior consists of masonry, metal panels, and glass. There is an outside patio for employees to use for lunches and breaks. The interior is designed as a high-end pet care facility. It includes a large waiting and reception area, administrative support areas, a locker room, a breakroom, conference spaces, exam rooms, surgical and operating rooms, procedure rooms, a CT scan, and an MRI room. The project was completed within the 10-month schedule and stayed on budget. All construction was completed to achieve high-end pet care needs, including epoxy floors throughout much of the space for cleanability, durable Midmark cabinets with solid surface countertops, overhead surgical light fixtures as needed, and medical gas and vacuum systems throughout the space to meet procedural and operating needs. The project was constructed over the winter months, so temporary heat was needed to provide a workable construction environment. Regular quality meetings and inspections were performed by the FCI team to ensure the project was built according to plans and specifications.
Submitter: First Companies, Inc.
Architect: R2 Design Group
Size: 24,889 SF
Location: Grand Rapids, MI
Date contract completed: August 2024
Final contract value: $11,881,000
Project manager’s name: Jason Beeke
Superintendent’s name(s): Scott Steenwyk
What percentage of the work scope was self-performed by your company? 0%
eicawardsdev
on
June 13, 2025
Harwood Flats brings new energy to downtown Whitehall with 32 modern apartments, ground-floor retail, and covered parking. Set between White Lake and Montague, the building offers scenic views, open layouts, and easy access to nearby parks and trails, creating a walkable connection between downtown and the lakeshore.
Submitter: Veneklasen Construction
Architect: Integrated Architecture
Size: 31,842 SF
Location: Whitehall, MI
Date contract completed: January 2025
Final contract value: $7,804,000
Project manager’s name: Nick Cadarette
Superintendent’s name(s): Jesse Fuerch, Bill Gagnon, & Jason Stephens
What percentage of the work scope was self-performed by your company? 20%
eicawardsdev
on
June 13, 2025
Buist provided low-voltage services for the new 96-bed, 72,000 SF Southridge Behavioral Hospital in Byron Center. The scope of work included structured cabling, access control, surveillance, and fiber infrastructure to support the hospital’s $46,000,000 facility, which opened in March 2025 and employs 170 medical professionals.
Submitter: Buist Electric
Architect: Stengel Hill
Title: UHS & Trinity Health MI — Southridge Behavioral Hospital
Size: 96 SF
Location: Byron Center, MI
Date contract completed: March 2025
Final contract value: $717,581
Project manager’s name: Jason Williams
Superintendent’s name(s): Derek Cass
What percentage of the work scope was self-performed by your company? 100%
eicawardsdev
on
June 13, 2025
Fox Ford’s new pre-engineered metal building is designed to support top-tier vehicle service with the space, style, and efficiency that today’s operations demand. The use of wide bay joists, insulated metal panels, and the mezzanine creates a functional building that looks good.
Submitter: Pioneer Construction Inc
Architect: Paradigm Design
Size: 50,000 SF
Location: Grand Rapids, MI
Date contract completed: February 2025
Final contract value: $2,100,000
Project manager’s name: Adam Wheeler
Superintendent’s name(s): Steve Suchowian
What percentage of the work scope was self-performed by your company? 100%
eicawardsdev
on
June 13, 2025
EHTC enlisted Rockford to build a new, three-story headquarters in downtown Ada. The first two floors are comprised of general office space, collaboration areas, and large meeting rooms, while the third floor features a lounge and kitchen area with a private golf simulator and access to a rooftop patio.
Submitter: Rockford
Architect: Dixon Architecture
Size: 20,000 SF
Location: Ada, MI
Date contract completed: September 2024
Final contract value: $6,200,000
Project manager’s name: David Dahlquist
Superintendent’s name(s): Greg Wallin
What percentage of the work scope was self-performed by your company? 20%
eicawardsdev
on
June 13, 2025
O-A-K built Edgerton Trails Elementary, an 80,000 SF K–5 educational facility addressing modern learning challenges through innovative design. The project features STEM labs, adaptable studios, collaborative zones, and outdoor classrooms. Construction balanced natural light with security, integrated technology infrastructure, and created spaces supporting both individual study and group learning.
Submitter: Owen-Ames-Kimball
Architect: GMB Architecture + Engineering
Size: 80,055 SF
Location: Rockford, MI
Date contract completed: August 2024
Final contract value: $24,800,000
Project manager’s name: Rob Gulliver
Superintendent’s name(s): Jared Gauss & Carlos Garcia
What percentage of the work scope was self-performed by your company? 0%
eicawardsdev
on
June 13, 2025
The construction of Ada Hotel was no simple feat, but it has come to a beautiful completion! Boasting high-end finishes, creative ties to local places and memories, and a perfect location in the heart of the village, this boutique hotel has become Ada’s crowing jewel.
Submitter: First Companies, Inc.
Architect: Dixon Architecture, OTJ Architects
Size: 38,445 SF
Location: Ada, MI
Date contract completed: August 2024
Final contract value: $26,000,000
Project manager’s name: Matt Zimmerman
Superintendent’s name(s): Eric Kleeman, Manuel Plascencia, Glenn Kroll, & Dave Ziomkowski
What percentage of the work scope was self-performed by your company? 0%
eicawardsdev
on
June 13, 2025
Wolverine completed Specialty Tooling System’s Building #2 one year after constructing their primary facility. Known as their “dirty building,” Building #2 provides manufacturing space for Specialty Tooling System to fabricate and paint the steel used in their robotic assembly lines, with an enormous press pit that expanded their efficiency and production capacity.
Submitter: Wolverine Building Group
Architect: Wolverine Building Group
Size: 45,000 SF
Location: Grand Rapids, MI
Date contract completed: April 2024
Final contract value: $5,900,000
Project manager’s name: Trevor Campbell & Justin Monson
Superintendent’s name(s): Matt Smith
What percentage of the work scope was self-performed by your company? 30%
eicawardsdev
on
June 13, 2025
A former high school is now the world’s largest dedicated Special Olympics facility. The Unified Sports & Inclusion Center supports 20,000 athletes statewide, offering inclusive sports, wellness, and training programs, and houses 10 nonprofits. The outdoor complex boasts tracks, fields, bocce courts, pickleball, and more—all built to champion inclusion.
Submitter: Rockford
Architect: Fishbeck, Mathison | Mathison Architects
Size: 43,5000 SF
Location: Grand Rapids, MI
Date contract completed: September 2024
Final contract value: $13,500,000
Project manager’s name: David Dahlquist
Superintendent’s name(s): Jan Beerthuis
What percentage of the work scope was self-performed by your company? 15%