AGM worked with the design and construction team to develop and refine critical material attachment, termination, and interface conditions, resulting in a well-orchestrated array of highly ornate, custom-fabricated material assemblies that positively influenced the overall customer experience.
Facts
Submitter: Architectural Glass & Metals, Inc.
Architect: Progressive Companies
Location: Grand Rapids, MI
Date contract completed: March 2026
Final contract value: $8,750,000
Project manager’s name: Bryan Dennis
Superintendent’s name(s): Nick Mainstone
What percentage of the work scope was self-performed by your company? 100%
AMI has been a longtime partner of Pine Rest Christian Mental Health Services, with their presence familiar across campus. This time, they brought the new Pediatric Center of Behavioral Health to life, completing their work over seven months and taking pride in both the challenge and the finished result.
Facts
Submitter: Architectural Metals Inc.
Architect: BWBR
Size: 14,820 SF
Location: Grand Rapids, MI
Date contract completed: October 2025
Final contract value: $1,005,000
Project manager’s name: Craig Engelbrecht
Superintendent’s name(s): Cory Arp
What percentage of the work scope was self-performed by your company? 100%
The Muskegon area is home to some wonderful projects. Cytiva — Project K Star will be joining the list! Architectural Metals’ team of professionals installed over 13,000 SF of product. Despite the extreme elements that are so well known to the Muskegon area, the AMI team is thrilled with the results of this collaboration with TRIA and Gilbane.
Facts
Submitter: Architectural Metals, Inc.
Architect: TRIA Architecture
Size: 13,500 SF
Location: Muskegon, MI
Date contract completed: February 2025
Final contract value: $1,356,000
Project manager’s name: Craig Engelbrecht
Superintendent’s name(s): Cory Arp
What percentage of the work scope was self-performed by your company? 100%
Architectural Metals Inc. (AMI) is no stranger to the aviation industry, but the Otter Air hangar project proved to be a uniquely exciting opportunity. The complexity of both the interior space and exterior brought new opportunities that pushed the team to innovate, making the end result especially rewarding.
Architectural Glass & Metals worked closely with the design and construction team through a collaborative design assist process to provide a comprehensive building envelope assembly, inclusive of complex multi-plane material interface conditions as required to achieve the overall design intent.
Facts
Submitter: Architectural Glass & Metals 2.0
Architect: GMB Architecture + Engineering
Size: 20,000 SF
Location: Holland, MI
Date contract completed: November 2024
Final contract value: $1,800,000
Project manager’s name: Mitch VanderArk
Superintendent’s name(s): Cody Jager
What percentage of the work scope was self-performed by your company? 100%
AGM worked closely with the design and construction team and key subtrades involved with the exterior building envelope assembly, as required, to maintain design intent while abiding by stringent tolerances governing material transitions, terminations, and overall performance criteria. The collaborative framework established by the on-site team proved beneficial to all project stakeholders.
Facts
Submitter: Architectural Glass & Metals, Inc.
Architect: TowerPinkster
Size: 165,000 SF
Title: Judge Charles A. Pratt Justice Center
Location: Kalamazoo, MI
Date contract completed: September 2023
Final contract value: $9,800,000
Project manager’s name: Jon Mutual
Superintendent’s name(s): Sanford MacKenzie
What percentage of the work scope was self-performed by your company? 100%
AMI’s scope of work was primarily composed of custom color ACM panels as well as a small area of Centria products. All together the scope accumulated to over 40,000 SF of panels.
Facts
Submitter: Architectural Metals, Inc.
Architect: HKS
Size: 43,000 SF
Title: Gerald R. Ford International Airport – Elevate Concourse A Expansion
Location: Grand Rapids, MI
Date contract completed: January 2024
Final contract value: $3,100,000
Project manager’s name: Mike Blossom
Superintendent’s name(s): Cory Arp
What percentage of the work scope was self-performed by your company? 100%
The exterior project created a modern look for the new Western Michigan University – Student Center. In coordination with the glazing contractor, the glass and custom metal fin exterior products produce a modern and captivating exterior finish system.
Facts
Submitter: Ritsema Associates
Architect: CannonDesign
Title: Western Michigan University – Student Center
Location: Big Rapids, MI
Date contract completed: February 2024
Final contract value: $5,580,000
Project manager’s name: John Nevins
Superintendent’s name(s): Frank Bryan
What percentage of the work scope was self-performed by your company? 98%
AMI was contracted by Triangle Associates to enclose Ferris State University’s Center for Virtual Learning. Their dedication to craftsmanship seamlessly integrates the new building into the campus, reflecting AMI’s commitment to quality construction.
Facts
Submitter: Architectural Metals, Inc.
Architect: Stantec
Size: 15,000 SF
Title: Ferris State University – Center for Virtual Learning
Location: Big Rapids, MI
Date contract completed: September 2023
Final contract value: $3,100,000
Project manager’s name: Mike Blossom
Superintendent’s name(s): Steve Ellison
What percentage of the work scope was self-performed by your company? : 100%