Story
This project required swift execution within a compact downtown site. The Brigade Fire Protection team successfully designed, coordinated, and installed a fire sprinkler system featuring a 1000 GPM fire pump, two standpipes, 10 floor control valves, one dry system, 2,533 sprinkler heads, and thousands of feet of steel piping, all while adhering to the demanding schedule.
Facts
Submitter: Brigade Fire Protection
Architect: Perkins&Will
Size: 24,1000 SF
Location: Grand Rapids, MI
Date contract completed: November 2024
Final contract value: $1,218,000
Project manager’s name: Josh McCormick
Superintendent’s name(s): Chad Cato
What percentage of the work scope was self-performed by your company? 100%